On an early spring visit to Breezy Hill just after the snow melted, President Dave Tabor observed pieces of the Porter Turret
Telescope roof had blow off over the winter.
Fortunately, with a thick and sound roll-roofing underlayment, no water damage had been done to the
building - but the cedar shakes clearly were in need of replacement.
Dave organized and led a couple of work parties to remove and replace the roof, which is documented on this page.
The new shakes are premium red cedar, as are the ridge boards.
Also done at this time: the two south-side rake boards were replaced and painted white. The metal loading steps were also painted at this time.
Workers on this project were:
Matt Considine,
Steven Forbes,
John Gallagher,
Jeff Lowe,
Carl, Zhenya, Olga & Tatyana Malikowski,
Ken Slater,
and Dave & Julie Tabor
.
The work party was also very grateful for lunch provided by Cheryl
Breuning and the Wilders.
Saturday 2015-May-16
We entirely removed the old cedar roof and disposed of it.
Then we re-roofed the west side of the roof and replaced the
south-side rake boards.
9:25 Matt get started removing shingles from the loading platform.
Matt Gets Started
10:21 Matt, Zhenya, Olga and Ken removing shingles.
Removing Shingles
10:24 Zhenya attacks the old shingles with a shovel. Ken, Zhenya, Olga Á Matt.
Brittle Shingles Shatter
10:25 Ken stretches with a pry bar to work on the ridge. Ken, Olga, Zhenya.
Shoveling Shingles Loose
10:32 Matt's truck is loaded with removed debris. Olga, Tatyana, Zhenya, Ken, Matt.
Matt's Debris Hauler
12:41 Olga and Matt clean up nails and stuck bits.
Cleaning Up Nails
12:42 Matt's victory pose - ready for the new roof!
Victorious Matt
2:58 Ken and Steven install new shingles. Note new rake board Dave made and installed.
New Rakes, New Shingles
4:06 West side and rake boards done - east side just has roll roofing for now.
There was a big effort to clean up the grounds before this photo was taken.
West Side Done - Looks Good!
Saturday 2015-Jun-06
We installed new shingles on the east side, installed the new
red cedar ridge boards, and painted the new rake boards and the
metal steps and loading platform.
9:54 Dave and Ken roll out the first sheet of tar paper.
Rolling out the Tar Paper
10:15 Dave and Carl attach the south end of the tar paper.
Attaching and Cutting
10:22 Ken checks a make-shift ladder support.
Make-shift Ladder Support
10:24 Rolling out the second sheet of tar paper. John, Ken, Carl and Dave.
More Tar Paper
10:27 Ken climbs up to tuck
in the tar paper at the ridge. Dave hold at left.
Tucking in the Tar Paper
Winter, John Martin's dog, came up from the pavilion to watch us work for a while.
Winter Watches
10:31 Fastening the second sheet of tar paper. John, Carl, Ken and Dave.
Finishing up the Tar Paper
10:50 Shingling. Jeff, John, Carl, Ken and Dave.
Shingles Going Up
11:30 Almost done, just the ridge boards to put on. Ken, John Martin, Dave, Jeff, John and Carl.